Skip to content

TODO in Lotus: fixes in ETH deploy test #1503

Open
@maciejwitowski

Description

@maciejwitowski
  • The contract installation and invocation can be lifted into utility methods URL
  • We can either skip the assertion if the msg has already landed, or pause mining between the embryo creation and this assertion URL
  • The right time to exit this loop isn't after 20 iterations, but when StateWaitMsg returns URL

Metadata

Metadata

Assignees

No one assigned

    Labels

    Type

    No type

    Projects

    No projects

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions